Trail project for 4G technology in 6th of October city:
Planned sites : 6th of October city(4G Technology)
DL rate 2 Mbps / UL rate 1 Mbps at cell edge
Long – short Microwave preparation project
Huge tender for backup solution for fiber network and MSAN connection
Scope:
Construction Works of GF/RT Sites (normal sites or Palm tree sites):
Civil Works, Tower Erection, Shelter and RF Installation, physical parameters checking…).
Turn key project preparation include WiMAX/Microwave-Acquisition and Telecom
Blog Post
Vodafone Projects
GITEC Company 2012 – 2014:
Full turnkey (Vodafone project).
Exclusive
Egysacom Company 2013:
Construction Works of Rooftop Sites: In door , Out door and Stub Tower (with internal fittings).
Horizon Company 2014 – 3rd Q of 2016:
Full turnkey (Vodafone project).
Mobinil project
Orascom Company (OCI) since 2012
DCS Construction Works of RT & Green Field Sites: Civil Works, Shelter and RF (Feeder and Antenna) Installation.
Etisalat Projects
Ericsson Company since 2015:
Cell Net Company (GSM Sites ) 2014:
Construction Works of Rooftop Sites: In door , Out door and Stub Tower (with internal fittings).
Vodafone & Etisalat, Egypt (GSM Sites)
From Ericsson Company Direct to MCCT since 2015
And through 2011 – 2014:
Tietec ,
Delta
AGM company
Scope:
Construction Works of Greenfield Sites: Civil Works, Tower Erection, Shelter and RF Installation (with internal fittings: Air-Conditioner, A/C Controller, DC/Ac panel, Fire Fitter system, DDF, power connections, wiring, feeder cable entry glands, switches, power sockets, environmental monitoring system, external light & earthing system).
Construction Works of Rooftop Sites: Shelter, and Stub Tower (with internal fittings).
WE Projects
Nokia
Construction Works of Green Field and Rooftop Sites.