From Ericsson Company Direct to MCCT since 2015
And through 2011 – 2014:
Tietec ,
Delta
AGM company
Scope:
Construction Works of Greenfield Sites: Civil Works, Tower Erection, Shelter and RF Installation (with internal fittings: Air-Conditioner, A/C Controller, DC/Ac panel, Fire Fitter system, DDF, power connections, wiring, feeder cable entry glands, switches, power sockets, environmental monitoring system, external light & earthing system).
Construction Works of Rooftop Sites: Shelter, and Stub Tower (with internal fittings).